Sunday, January 18, 2009

More progress

The Longfellow Bridge is almost done, I only have to build the last section over Memorial Drive in Cambridge which is a simple girder bridge.

I have spend most of the last week doing Charles St. station and I have to say it looks decent. I textured the outside with an image taken from a photo to get the weathered copper look.

I also added some elevated sections from Fred Barbieri's NY elevated package. They aren't an exact match but they look pretty good. This is for the section from Charles Sta to the tunnel entrance.

No comments:

Post a Comment